PROJECT CASE STUDY

Restructuring, Rehabilitation and Pressure Management of Al-Shoubak water distribution network

Shobak, Jordan

Infrastructure

Project Overview

  • Pipeline Installation: Supply and installation of over 20,000 linear meters of Ductile Iron pipes (various diameters) and over 9,000 meters of Polyethylene (HDPE) pipes.

  • Pumping Station Rehabilitation: Increasing the capacity of the "Nijil" station to 110 m³/hour, including civil, mechanical, and electrical works.

  • Reservoir Construction: Execution of a 1,000 m³ collection tank with all necessary accessories.

  • Automation & Control: Installation of SCADA systems for water monitoring, and a Pressure Management System (PMS) to reduce Non-Revenue Water (NRW).

  • Facilities: Construction of administrative buildings, warehouses, and security rooms at the site.

Project Gallery

ENGINEERING COMPANY
Built on Legacy Designing the Future.
  • Facebook
  • LinkedIn
  • Whatsapp
Head Office

Amman, Jordan - Abdali

 

Jabal Al Hussein - Khalid Bin Al Waleed St. - 246

Contact

Tel: +962 6 566 8188

Tel: +962 6 565 9991

© 2023 - 2025 Arab Dar Engineering Company (ADEC). All rights reserved.

bottom of page