Project Overview
Installation of over 54 km of main and branch pipelines (Ductile Iron and HDPE).
Installation of 440 home connections.
Rehabilitation of the Umm Al-Shajirat Pumping Station with a capacity of 500 m^3/h.
Improvement of civil and mechanical works for the Tabarbour Ground Tank.
Installation of electromagnetic meters, valves, and pressure reducing manholes for distribution zone isolation