PROJECT CASE STUDY

The Hallabat Well Field Transmission Pipeline Project

Zarqa, Jordan

Infrastructure

Project Overview


Description of Project:


The project involves the supply and installation of ductile pipelines, including 25,265 linear meters with a diameter of 600 mm and 12,297 linear meters with a diameter of 900 mm. It includes the design and construction of a water pumping station covering all civil, structural, and electrical works. The facility features a water hammer protection system and a SCADA system. Additionally, the project includes the construction of a collection reservoir with a capacity of 5,000 m³ and a storage reservoir with a capacity of 2,000 m³.


Description of Actual Services Provided by Arab Dar:


As "The Engineer" on-site, our role encompassed:

  • Design Review: Conducting comprehensive reviews of detailed designs, shop drawings, and method statements.

  • Contract Administration: Managing claims, variations, and certifying monthly progress payment certificates.

  • Technical Supervision: Overseeing all civil, mechanical, and electrical works, including the commissioning of the pumping station and SCADA integration.Quality & Handover: Auditing as-built drawings, finalizing O&M manuals, and ensuring adherence to technical Standards.

  • Environmental and Social (E&S) Safeguards: We ensured full compliance with the Environmental and Social Management Plan (ESMP).

Project Gallery

ENGINEERING COMPANY
Built on Legacy Designing the Future.
  • Facebook
  • LinkedIn
  • Whatsapp
Head Office

Amman, Jordan - Abdali

 

Jabal Al Hussein - Khalid Bin Al Waleed St. - 246

Contact

Tel: +962 6 566 8188

Tel: +962 6 565 9991

© 2023 - 2025 Arab Dar Engineering Company (ADEC). All rights reserved.

bottom of page