top of page
Project Overview
The project involves the design, supply, and construction of the following key components:
Water Storage Reservoirs:
Design and construction of a 5,000 m³ reinforced concrete reservoir.
Design and construction of a 2,000 m³ reinforced concrete reservoir.Pumping Station:
Design and construction of a complete main pumping station.Transmission Pipelines:
Supply and installation of 900 mm diameter Ductile Iron (DI) pipelines.
Supply and installation of 600 mm diameter Ductile Iron (DI) pipelines.
Project Gallery

bottom of page