Restructuring, Rehabilitation and Pressure Management of Al-Shoubak water distribution network
Pipeline Installation: Supply and installation of over 20,000 linear meters of Ductile Iron pipes (various diameters) and over 9,000 meters of Polyethylene (HDPE) pipes.
Pumping Station Rehabilitation: Increasing the capacity of the "Nijil" station to 110 m³/hour, including civil, mechanical, and electrical works.
Reservoir Construction: Execution of a 1,000 m³ collection tank with all necessary accessories.
Automation & Control: Installation of SCADA systems for water monitoring, and a Pressure Management System (PMS) to reduce Non-Revenue Water (NRW).
Facilities: Construction of administrative buildings, warehouses, and security rooms at the site.
Gallery
Similar Projects
InfrastructureRestructuring and Rehabilitation of Al-Shobak Water Network
Shobak, Jordan View case study
InfrastructureNetwork Rehabilitation of As-salt Down Town (Naqab,Sawada)
Balqa, Jordan View case study
InfrastructureOngoing