Wastewater Collection System in Irbid, Ramtha, and ajloun
Waste Water Collection System in Irbid, Ramtha, and ajloun.
Irbid
Network length 9.5 Km (200-150)mm
Contractor : Direh Contracting
Ramtha
Network length 15 Km (200-150)mm
Contractor : Maiysra Contracting
Ajloun
Network length 2.5 Km (200-150)mm
Contractor : Al-Mahasneh Contracting