top of page

PROJECT CASE STUDY

Irrigation System For Almenia Palm Farm

Minya, Egypt

Infrastructure

Project Overview

Irrigation System For Almenia Palm Farm


Two Well Pumps with Capacity of 440 m³/hour 

Two Lajoon with Capacity of 10,000 m³

Irrigation Network : 65 Km

Road Network Works


Project Gallery

ENGINEERING COMPANY
Built on Legacy Designing the Future.
  • Facebook
  • LinkedIn
  • Whatsapp
Head Office

Amman, Jordan - Abdali

 

Jabal Al Hussein - Khalid Bin Al Waleed St. - 246

Contact

Tel: +962 6 566 8188

Tel: +962 6 565 9991

© 2023 - 2025 Arab Dar Engineering Company (ADEC). All rights reserved.

bottom of page