Rehabilitation Of Husban Irrigation
Rehabilitation of Irrigation Network at Husban & Kafreen Villages Phase II.
1. Irrigation Network Works Consist of:
a. HDPE (400) mm (8.7) Km.
b. HDPE (355) mm (1.55) Km.
c. HDPE (315) mm (13) Km.
d. HDPE (250) mm (10.9) Km.
e. HDPE (180) mm (6.8) Km.
f. HDPE (25) mm (3.5) Km.
g. Valves, Washout, ARV & PRV.
h. F.T.A (400).
2. Road Network Works.