ع
Rehabilitation Of Husban Irrigation

Projects / Infrastructure

Rehabilitation Of Husban Irrigation

InfrastructureIrrigation

Rehabilitation of Irrigation Network at Husban & Kafreen Villages Phase II.

1. Irrigation Network Works Consist of:

a. HDPE (400) mm (8.7) Km.

b. HDPE (355) mm (1.55) Km.

c. HDPE (315) mm (13) Km.

d. HDPE (250) mm (10.9) Km.

e. HDPE (180) mm (6.8) Km.

f. HDPE (25) mm (3.5) Km.

g. Valves, Washout, ARV & PRV.

h. F.T.A (400).

2. Road Network Works.

Gallery