top of page

PROJECT CASE STUDY

Rehabilitation Of Husban Irrigation

Madaba, Jordan

Infrastructure

Project Overview


Rehabilitation of Irrigation Network at Husban & Kafreen Villages Phase II.


1. Irrigation Network Works Consist of:

a. HDPE (400) mm (8.7) Km.

b. HDPE (355) mm (1.55) Km.

c. HDPE (315) mm (13) Km.

d. HDPE (250) mm (10.9) Km.

e. HDPE (180) mm (6.8) Km.

f. HDPE (25) mm (3.5) Km.

g. Valves, Washout, ARV & PRV.

h. F.T.A (400).


2. Road Network Works.

Project Gallery

ENGINEERING COMPANY
Built on Legacy Designing the Future.
  • Facebook
  • LinkedIn
  • Whatsapp
Head Office

Amman, Jordan - Abdali

 

Jabal Al Hussein - Khalid Bin Al Waleed St. - 246

Contact

Tel: +962 6 566 8188

Tel: +962 6 565 9991

© 2023 - 2025 Arab Dar Engineering Company (ADEC). All rights reserved.

bottom of page