top of page
Project Overview
Consultancy Services for Feasibility Study, Detailed Design, and Tender Documents
Wastewater Collection Systems and Pumping Stations – South Amman Phase III, Jordan
Design of main gravity sewers (Ø 200–500 mm), total length 453 km
Design of house connections (Ø 150 mm), total length 67 km
Design of force mains, total length 6 km
Design of two (2) wastewater pumping stations
Approximately 9,300 end-user wastewater connections
Project Gallery
bottom of page