top of page
Project Overview
Consultancy Services for Feasibility Study, Detailed Design, and Tender Documents
Wastewater Collection Systems and Pumping Stations – Madaba Governorate, Jordan
Design of main gravity sewers (Ø 200–800 mm), total length 175 km
Design of house connections (Ø 150 mm), total length 25 km
Design of force mains, total length 17 km
Design of two (2) wastewater pumping stations
Approximately 3,550 end-user wastewater connections
Project Gallery
bottom of page