PROJECT CASE STUDY

Al-Husainyeh Treatment Plant

Ma'an, Jordan

Infrastructure

Project Overview

  • Consultancy Services for Feasibility Study, Detailed Design, and Tender Documents

  • Wastewater Collection Systems and WWTP – Al-Huseiniya, Ma’an Governorate, Jordan

  • Design of main gravity sewers (Ø 200–500 mm), total length 75 km

  • Design of house connections (Ø 150 mm), total length 6.5 km

  • Approximately 834 end-user wastewater connections

  • Design of wastewater treatment plant (WWTP) with capacity 3,250 m³/day